Please turn off your ad blocker so we can further develop the platform.
No direct search hits "wa 081227825310 biaya yang diperlukan untuk bikin pagar lisplang pvc murah pasar kliwon solo"
First, look for the material (steel, wood, leather, paper, ...) your goods are made of. If it is a complex structure and the material cannot be clearly determined, look for its intended use (instrument, machine, clothing, seal, ...). Please note that only the first 6 digits are valid worldwide (HS Code / Harmonized System). If you have an 8 or more digit number from outside the EU, this number does not necessarily apply to the EU.AI powered search results
Wooden shuttering for concrete constructional work (excl. plywood boarding)
72%
Builders' joinery and carpentry, of wood, incl. cellular wood panels, assembled flooring panels, shingles and shakes, of wood (excl. plywood panelling, blocks, strips and friezes for parquet flooring, not assembled, and pre-fabricated buildings)
71.8%
Flooring panels for mosaic floors, assembled, of bamboo or with at least the top wear layer of bamboo
71.7%
Cellular wood panels
71.5%
Flooring panels, assembled, of wood other than bamboo (excl. multilayer panels and panels for mosaic floors)
71.3%
Flooring panels, assembled, of bamboo or with at least the top wear layer of bamboo (excl. for mosaic floors)
71.3%
Flooring panels for mosaic floors, assembled, of wood other than bamboo
71.3%
Flooring panels, assembled, of bamboo or with at least the top wear layer of bamboo
71.2%
Builders' joinery and carpentry, of bamboo (excl. windows, French windows and their frames, doors and their frames and thresholds, posts and beams, assembled flooring panels, wooden shuttering for concrete constructional work, shingles, shakes, engineered structural timber products and prefabricated buildings)
71.2%
Builders' joinery and carpentry, of wood (excl. of bamboo, windows, French windows and their frames, doors and their frames and thresholds, posts and beams, assembled flooring panels, wooden shuttering for concrete constructional work, shingles, shakes, engineered structural timber products, cellular wood panels and prefabricated buildings)
71.2%
Flooring panels, multilayer, assembled, of wood other than bamboo (excl. for mosaic floors)
71.1%
Shingles and shakes, of wood
70.4%
Doors and their frames and thresholds, of tropical wood (excl. of okoumé, obeche, sapelli, sipo, acajou d'Afrique, makoré, iroko, tiama, mansonia, ilomba, dibétou, limba, azobé, dark red meranti, light red meranti, meranti bakau, white lauan, white meranti, white seraya, yellow meranti, alan, keruing, ramin, kapur, teak, jongkong, merbau, jelutong, kempas, virola, mahogany "Swietenia spp.", imbuia, balsa, palissandre de Rio, palissandre du Brésil or palissandre de Rose)
70.2%
Builders' ware for the manufacture of flooring, walls, partition walls, ceilings, roofing, etc. guttering and accessories, banisters, fences and the like, fitted shelving for shops, factories, warehouses, storerooms, etc., architectural ornaments such as fluting, vaulting and friezes, of plastics, n.e.s.
71.1%
Reservoirs, tanks, vats and similar containers, of plastics, with a capacity of > 300 l
70.6%
Building elements for the manufacture of floors, walls, partition walls, ceilings, roofs, etc., of plastics; gutters and accessories of plastics; railings, fences and similar barriers, of plastics; large shelves, for assembly and permanent installation in shops, workshops, etc., of plastics; architectural ornaments, e.g. friezes, of plastics; fittings and similar products for permanent mounting on buildings, of plastics
70.2%
VEGETABLE PLAITING MATERIALS; VEGETABLE PRODUCTS NOT ELSEWHERE SPECIFIED OR INCLUDED
70.6%
Plywood, veneered panel and similar laminated wood, of bamboo, not containing particle board and without blockboard, laminboard or battenboard (excl. sheets of compressed wood, cellular wood panels, parquet panels or sheets, inlaid wood and sheets identifiable as furniture components)
70.4%
Copper tube or pipe fittings "e.g., couplings, elbows, sleeves"
70.4%
Prefabricated buildings, whether or not complete or already assembled
70.4%